By Day of Month

The following table lists the date and time fields available if you select the By Day of Month option from the Frequency drop-down list:

Field Label

Description

Day of Month

Include the days of a month you want the job to execute. For more information, see the steps below to include or exclude an entity.

For example, if you include 1, 15, and 30, the job is executed on the selected days of the month at the time specified.

Last Day of Month

Select the check box if you want to execute the job at the last day of the month.

Closest Workday

Select the check box if you want to execute the job on the closest workday if the selected day(s) of the month falls on a weekend.

For example, if you include 15 in the Day of Month field and select the check box, the job will execute:

  • On Friday the 14th, if 15th is a Saturday, and

  • On Monday the 16th, if 15th is a Sunday.

Repeat Interval Days

Enter the number of days after which the job execution must be repeated.

The valid range of values is 1 to 30.

For example, if you enter 2, the job execution will be repeated every two days.

If you do not enter a value in this field, the job will execute only on the day(s) selected in the Day of Month field.

Start Date

Enter the date you want the job to execute for the first time.

If you do not enter a date, the current date is assumed as the start date.

If you enter a date older than the current date, N4 starts executing the job at the first possible time depending on the time schedule.

End Date

Enter the date you want the job to stop executing.

If you do not enter a date, once scheduled, the job will continue to execute according to the schedule that you set up until you manually unschedule the job using the Actions Unschedule option.